Using ExtendSim, the authors constructed a system model, MOSIM, that uses the physical reservoir data and minimum releases for hydropower and environmental constraints from a long-term study of the Missouri River basin. The value was based on the hydropower generated by the main-stem dams for a simulated period of 1898–1996 using MOSIM. Simulated forecasted flows were generated to represent the levels of predictability that had been determined in a previous study. The results demonstrate that use of climate forecast information along with better definition of the basin moisture states can improve runoff predictions with modest economic value that, in general, will increase as the size of the reservoir system decreases.
Potential Effects of Long-Lead Hydrologic Predictability on Missouri River Main-Stem Reservoirs
- Source: Journal of Climate - Issue 17, Volume 2
- Date: 2004