The Tonkolili Iron Ore Project managed by African Mineral Limited uses a complete pit-to-port model inclusive of mine processing operations and stockpiling, single line rail network (for supply and export), port landside (car dumper, stockpiling, etc), and port marine (ship loading/unloading, inbound/outbound movement to anchorage etc). The model was calibrated to engineering and operational design specifications and real environmental conditions.